04/07 EINS 512048PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLING THIS APPLIANCEFor use in GB and IEInstallationInstructionsLEAVE WITH CUSTOMER2 BURNE
11. Complete the main cooker build and loosely screw down the top plate.12. (a) Remove Gas Hob from box.(b) Disconnect electrical supply cable from ho
18. Connect electrical cable to a fused double pole switch, as described in General Requirements.Fuse Rating - 3 ampsCable Colour CodingBrown - LiveBl
21. Attach two fixing disc gaskets to the two fixing discs (one for each burner size). (See Fig. 14).22. Attach two fixing discs to the hob using 4 (M
24. PRESSURE TESTING (SEE FIG. 16).The pressure test point is situated at the injector of the rear burner (rapid).Fit the pressure gauge onto the burn
Position pan support on to the location pins on top of the burner heads. (See Fig. 18).25. Verify that the top plates are level.26. Secure handrails a
For further advice or information contactyour local distributor/stockistWith Aga’s policy of continuous productimprovement, the Company reserves the r
SECTION PAGEGENERAL REQUIREMENTS 3 SPECIFICATIONS 4TECHNICAL DATA 5INSTALLATION SEQUENCE & PROCEDURE 6-142CONTENTS
IMPORTANTPLEASE READ THROUGH COMPLETELY BEFORE COMMENCING INSTALLATION.WARNING: THIS APPLIANCE SHALL BE INSTALLED IN ACCORDANCE WITH THEREGULATIONS IN
SPECIFICATIONS4COOKER DIMENSIONSWhen surveying for a cooker installation the actual clearance required for the ‘body’ of theappliance should be increa
NATURAL GAS - G20 (APPLIANCE CATEGORY 12H)FRONT BURNER REAR BURNERBURNER TYPE SEMI-RAPID RAPIDMAXIMUM HEAT INPUT 1.75kW 3.25kWINJECTOR MARKING 097 130
INSTALLATION SEQUENCE AND PROCEDURELoose ItemsOn unpacking the hob unit, check that the following items are included before discardingpackaging:1. Ins
b) Isolate the gas supply and connect 8mm diameter pipework up to the approximate positionfor final connection to the hob unit. (See Fig. 4).4. Prepar
86. Non-Electric Agas only - Fit 2 layers of insulation blanket JPAD210722 (supplied with hob)on top of the oven roof. (See Fig. 6).7. Electric Aga -
8. Place the hotcupboard unit into position alongside the main Aga baseplate, carefully feeding the gas supply pipe through the appropriate holes, and
Kommentare zu diesen Handbüchern